Claxton has worked on projects ranging from straightforward equipment rental to world-beating innovations - often enhancing project economics. Learn more about these tasks, here.
You would be forgiven for thinking that there's not much to get excited about when it comes to protective structures. However, as Claxton has recently proved on a project for Senergy, with the right mix of experience and equipment it's possible to add real value to both the structure and the installation process... [read more]
A Claxton template helps ensure first oil from Tombua-Landana at the earliest opportunity... [read more]
Claxton's rigless abandonment of Perenco Well A1 in Leman field in 2003 was a game changer: it was the first such project to be carried out in the North Sea without using a jackup rig.... [read more]
Flexibility and teamwork ensure the success of an unusual project that added a new slot to an existing offshore platform... [read more]
Claxton designers have used their ingenuity to supply a small but perfectly formed hydraulic power unit to upgrade the tensioning system on the Ensco 102 jackup drilling rig - part of a suite of upgrades designed to upgrade it's operating envelope... [read more]
Claxton's new tilting tension system pushes the boundaries of what can be done to help drillers in the North Sea... [read more]
At first glance, the Volve field drilling template is hardly extraordinary. However, some of its design features, the way it was taken offshore and its installation process render the template really quite special... [read more]
The highly innovative Claxton slip activated tension ring provides added value by eliminating space-out issues and allowing the ring to be positioned on the riser at any point. This avoids lost rig time from welding operations - as required with conventional welded load rings... [read more]
With the rising number of North Sea fields reaching the end of their useful economic life, an increasing number of operators are faced with well decommissioning projects. Operators have identified rig-less decommissioning of wells as a major cost saving initiative, but this involves technical challenges arising from the absence of a rig and many platforms having limited crane facilities. ... [read more]
As assets age many operators are looking to extend their lifecycles by recovering slots, and drilling new wells. Claxton have developed a range of equipment and services to meet these challenges and address the rigless slot recovery, well abandonment and decommissioning market... [read more]
Adequate planning is the key to successful tieback of wells and takes care of the interface between drilling, structural and mechanical engineering and the myriad of variations that can occur... [read more]
Acteon companies Claxton Engineering, 2H Offshore (2H) and Subsea Riser Products (SRP) have received an order from Venture Production plc to provide an ultra-high-pressure riser for use during a high-pressure, high-temperature (HP/HT) drilling campaign in the North Sea, which is scheduled for the fourth quarter of 2009... [read more]
The use of pre-drilling with templates and tiebacks is an optimum choice for marginal fields where additional reservoir data are needed and where drilling-to-production time needs to be reduced... [read more]