Claxton is often asked to provide tailored and bespoke engineering solutions in response to our clients operating needs.
These special projects often come about as a result of unforeseen challenges - Claxton's 25 years of experience can help to ensure successful resolutions to these issues.
Example Project: Rigless Abandonment Recovery Package
We also performed the first-ever rigless abandonment in the North Sea in a tight weather window - an operator had discovered a fatigued conductor. Claxton developed a recovery interface which enable the well to be cost effectively abandoned before the winter weather damaged the conductor further.
Example Project: Additional Platform Slot
An operator wanted to add an additional slot to a mature platform. Claxton developed a bracing system which enabled the new conductor guides to be securely located within the existing jacket.
See our case study section or technical articles for more examples of tailored engineering from Claxton.